BITLIS VIADUCT BRIDGE PROJECT
- Definition of Work: BAYKAM-BITLIS VIADUCT STEEL BRIDGE MANUFACTURING
- Scope of Work: SLIDING BRIDGE MANUFACTURING AND INSTALLATION
- Client: PYES INC. – DEMCE INC.
- Main Client: GENERAL DIRECTORATE OF HIGHWAYS DEPARTMENT OF PROGRAM AND MONITORING
- Year: 2021-2022
- Capacity: 7500 TONES OF MANUFACTURE AND INSTALLATION
- Location: BITLIS
SAPANCA ROPEWAY PROJECT
- Definition of Work: 9 PCS ROPEWAY TOWERS MANUFACTURE
- Scope of Work: ANCHOR AND YOKE MANUFACTURE
- Client: BURSA TELEFERIK INC. – LEITNER GROUP
- Year: 2021
- Capacity: 250 TONES MANUFACTURE
- Location: SAPANCA/SAKARYA
BOZKIR HYDROPOWER PLANT
- Definition of Work: HYDROMECHANICAL EQUIPMENT MANUFACTURE
- Scope of Work: HYDROMECHANICAL EQUIPMENT MANUFACTURE FOR DSI 4TH SITE – IRRIGATION (GATES, VALVES, PENSTOCKS, ETC.)
- Client: ERAY GRUP INC.
- Year: 2020
- Capacity: HYDROMECHANICAL EQUIPMENT AND PENSTOCK MANUFACTURE AND INSTALLATION OF 120 TONES
- Location: KONYA
TURKISH PETROLUM TANK
- Definition of Work: 20 m3 MANUFACTURING
- Client: TURKUSH PETROLUM
- Consultant:ETA
- Year: 2020
- Capacity: 20 M3
- Location: BATMAN
BOZKIR DAM
- Definition of Work: 1100 SLİDING VALVE ,1200 CONE VALVE , 2500 BUTTERFLY VALVE , PENSTOCK ETC… MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC CONSTRUCTION (KONYA DSİ 4. BÖLGE)
- Client: ERAY GROUP A.Ş
- Year: 2020
- Capacity: 300 TONS
- Location: KONYA
YENİ HAYAT ORTAKÖY HES
- Definition of Work: APROXİMATELY 450 TONES GATES AND PENSTOCK INSTALLATION
- Scope of Work: INSTALLATION
- Client: ÇİFTAY A.Ş
- Year: 2020
- Capacity: 450 TONES
- Location: ERZURUM
KARS KARAKURT DAM
- Definition of Work: 4000×5000 SLİDING VALVE MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
- Client: BİLSEV ENERJİ A.Ş.( ENERGO PRO A.Ş)
- Consultant:PUSULA
- Year: 2019-2020
- Capacity: 300 TONS
- Location: KARS
SOMA THERMAL POWER PLANT
- Definition of Work: HEAT EXCHANGERS
- Scope of Work: HEAT EXCHANGERS
- Client: GAMA COMPANY
- Year: 2014
- Capacity: 1 PIECE (Ø250MM L:1000MM)
- Location: MANİSA/TURKEY
KEMERKÖY THERMAL POWER PLANT
- Definition of Work: HEAT EXCHANGERS
- Scope of Work: HEAT EXCHANGERS
- Client: MINISTRY OF ENERGY and NATURAL RESOURCES
- Year: 2016
- Capacity: 2 PIECES (Ø900MM L:4000MM)
- Location: KÜTAHYA/TURKEY
DENİZLİ CCGT THERMAL POWER PLANT
- Definition of Work: HEAT EXCHANGERS
- Scope of Work: HEAT EXCHANGERS
- Client: AGE CONST. & TRADING CO.
- Year: 2017
- Capacity: 1 PIECE (Ø1500MM L:10000MM)
- Location: DENİZLİ/TURKEY
TANAP LOT-4
- Definition of Work: VALVE STATIONS SPOOLS, SUPPORTS -PIG TRAP STATIONS- BLOCK VALVE STATIONS-STEEL ROOF MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
- Client: PUNC LOYD -LİMAK-KALYON TRADING CO.
- Consultant:WORLEY PARSONS
- Year: 2017-2018
- Capacity: 10.000 WDI (WELDING DIAMETER INCH)
- Location: BALIKESİR,ESKİŞEHİR,ÇANAKKALE
MELEN DAM
- Definition of Work: PENSTOCK,GATES,VALVES,BİFURCATİON,MANIFOLD MANUFACTURING AND INSTALLATION WORKS.
- Scope of Work: HYDROMECANIC WORKS
- Client: ECE TUR ECE TURİZM İNŞ.TİC.VE MAĞ.İŞLT.A.Ş.
- Year: 2015– 2018
- Capacity : 5000 TONS
- Location: DÜZCE
İSRAEL EMBASSY BUILDING
- Definition of Work: SHELTERED STEEL WALL MANUFACTURING
- Scope of Work: STEEL CONSTRUCTION
- Client: AKİS MİMARLIK
- Year: 2018
- Capacity : 500 TONS
- Location: ANKARA
KARAKURT DAM
- Definition of Work: PENSTOCKS ,GATES,VALVES ,TRASHRACKS ETC… MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: AGE İNŞAAT VE TİCARET A.Ş.
- Consultant:PUSULA
- Year: 2017-2020
- Capacity: 4000 TONS
- Location: KARS
YENİ HAYAT HEPP PROJECT
- Definition of Work: PENSTOCK – TRANSITIONS & ELBOWS MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: SEMİX BETON SANTRALLERİ
- Year: 2017
- Capacity: 450 TONS
- Location: ERZURUM
TANAP LOT-2
- Definition of Work: BLOCK VALVE STATIONS-SPOOLS ,STEEL ROOF MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
- Client: SİCİM-YÜKSEL-AKKORD ORTAKLIĞI
- Consultant:WORLEY PARSONS
- Year: 2017-2018
- Capacity: 1400 TONS
- Location: ERZURUM-SİVAS
TANAP LOT-1
- Definition of Work: PIPE SPOOLS – BLOCK VALVE STATIONS-STEEL ROOF MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
- Client: FERNAS İNŞAAT A.Ş.
- Consultant:WORLEY PARSONS
- Year: 2017-2018
- Capacity: 6500 TONS (60.000 WDI)
- Location: ERZURUM-KARS
PARK TERMİK POWER PLANT
- Definition of Work: PENSTOCK AND Ø 1400 SLIDE VALVE MANUFACTURING
- Scope of Work: HYDROMECANIC
- Client: PARK CİNER HOLDİNG
- Year: 2017-2018
- Capacity: 500 TONS
- Location: SİİRT
TANAP LOT-4
- Definition of Work: SLEDGES
- Scope of Work: STEEL CONSTRUCTION
- Client: PUNJ LLOYD LİMAK KALYON JV
- Consultant:WORLEY PARSONS
- Year: 2016-2019
- Capacity: 1150 TONS
- Location: BALIKESİR
TANAP LOT-2
- Definition of Work: VALVE STATIONS SUPPORTS -PIG TRAP STATIONS- BLOCK VALVE STATIONS-STEEL ROOF MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
- Client: SİCİM-YÜKSEL-AKKORD ORTAKLIĞI
- Consultant:WORLEY PARSONS
- Year: 2016-2018
- Capacity: 590 TONS
- Location: ERZURUM-SİVAS
TANAP LOT-1
- Definition of Work: VALVE STATIONS SUPPORTS -PIG TRAP STATIONS-LINEMARKERS AND AERIAL MARKERS MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: FERNAS İNŞAAT A.Ş.
- Consultant:WORLEY PARSONS
- Year: 2016-2018
- Capacity: 530 TONS
- Location: ERZURUM-KARS
BALLIKAYA DAM
- Definition of Work: : PENSTOCK MANUFACTURING- Ø 2000 CONE VALVE – WATER INTAKE GATES -1800*1800 SLIDE VALVE MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: YÖNTAŞ İNŞAAT SANAYİ VE TİCARET A.Ş.
- Year: 2016-2017
- Capacity: 500 TONS
- Location: SAKARYA
AGE KAZAN WAREHOUSE BUILDING
- Definition of Work: WAREHOUSE BUILDING MANUFACTURING AND INSTALLATION
- Scope of Work: STEEL CONSTRUCTION
- Client: AGE İNŞAAT VE TİCARET A.Ş.
- Year: 2015
- Capacity: 350 TONS
- Location: ANKARA
MELEN DAM DRINKING WATER LINE
- Definition of Work: PENSTOCK -GATES- TRANSITION, WATER INTAKE STRUCTURE MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: ECE TUR-YÖNTAŞ ADİ ORTAKLIĞI-DSİ 14.BÖLGE
- Year: 2015-2018
- Capacity: 5000 TONS
- Location: DÜZCE
AMBAR DAM DERIVATION CONDUIT PENSTOCK PIPELINE
- Definition of Work: TRANSITION-EXPANSION JOINT-SLIDING SUPPORT –MANIFOLD MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: YÖNTAŞ TÜRKERLER ADİ ORTAKLIĞI-DSİ 10.BÖLGE
- Year: 2015-2016
- Capacity: 1000 TONS
- Location: DİYARBAKIR
AMBAR DAM DERIVATION CONDUIT
- Definition of Work: Ø1800 AND Ø2000 BUTTERFLY VALVE – Ø1200 CONE VALVE -1200*1200 SLIDE VALVE
- Scope of Work: HYDROMECANIC
- Client: YÖNTAŞ TÜRKERLER ADİ ORTAKLIĞI-DSİ 10.BÖLGE
- Year: 2015-2016
- Capacity: 6 ADET
- Location: DİYARBAKIR
GARZAN HPP PROJECT
- Definition of Work: HPP 900*900 HYDROLIC SLIDE GATE MANUFACTURING
- Scope of Work: HYDROMECANIC
- Client: FERNAS İNŞAAT A.Ş.
- Year: 2015
- Capacity : 1 ADET
- Location: BATMAN
HAYMANA TÜRKŞEREFLİ POND SLUICE OUTLET PENSTOCK PIPELINE
- Definition of Work: TRANSITION-EXPANSION JOINT-SLIDING SUPPORT –MANIFOLD MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: SÜRÜCÜ İNŞAAT MADENCİLİK-DSİ 5.BÖLGE
- Year: 2015-2016
- Capacity : 500 TONS
- Location: ANKARA
HAYMANA TÜRKŞEREFLİ POND SLUICE OUTLET PENSTOCK PIPELINE
- Definition of Work: Ø900 BUTTERFLY VALVE 700*700 SLIDING VALVE MANUFACTURING
- Scope of Work: HYDROMECANIC
- Client: SÜRÜCÜ İNŞAAT MADENCİLİK-DSİ 5.BÖLGE
- Year: 2015-2016
- Capacity: 3 QTY
- Location: ANKARA
MANYAS DIVERSION TUNNEL PENSTOCK PIPELINE REVISION
- Definition of Work: Ø800 BUTTERFLY VALVE MANUFACTURING
- Scope of Work: HYDROMECANIC
- Client: BE-HA-ŞE İNŞ.TİC. VE SAN.LTD.ŞTİ.-DSİ 25.BÖLGE
- Year: 2014
- Capacity: 1 QTY
- Location: BALIKESİR
YURTBAŞI-PEHLİVANLI-KARAGÖDEK-ÇATAKDERE SMALL DAM
- Definition of Work: Ø600 AND Ø350 BUTTERFLY VALVE MANUFACTURING AND İNSTALLATION
- 265*265 – 650*650 – 400*400 SLİDİNG VAVE MANUFACTURING AND INSTALLATION
- Scope of Work: HYDROMECANIC
- Client: SEZGİN İNŞAAT A.Ş.-DSİ 8.BÖLGE
- Client:MUZAFFER OLGUN GÜR A.Ş
- Year: 2016-2018
- Capacity: 14 QTY
- Location: ERUZURUM