SOMA THERMAL POWER PLANT

  • Definition of Work:  HEAT EXCHANGERS
  • Scope of Work:  HEAT EXCHANGERS
  • Client:  GAMA
  • Year: 2014
  • Turnover:  1 PIECE (Ø250MM L:1000MM)
  • Location: MANİSA/TURKEY

TUFANBEYLİ THERMAL POWER PLANT

  • Definition of Work:  HEAT EXCHANGERS
  • Scope of Work:  HEAT EXCHANGERS
  • Client:  ENERJİSA
  • Year: 2015
  • Turnover:  1 PIECE (Ø1000MM L:4000MM)
  • Location: ADANA/TURKEY

KEMERKÖY THERMAL POWER PLANT

  • Definition of Work:  HEAT EXCHANGERS
  • Scope of Work:  HEAT EXCHANGERS
  • Client:  MINISTRY OF ENERGY and NATURAL RESOURCES
  • Year: 2016
  • Turnover:  2 PIECES (Ø900MM L:4000MM)
  • Location: KÜTAHYA/TURKEY

SEYİTÖMER THERMAL POWER PLANT

  • Definition of Work:  HEAT EXCHANGERS
  • Scope of Work:  HEAT EXCHANGERS
  • Client:  MINISTRY OF ENERGY and NATURAL RESOURCES
  • Year: 2016
  • Turnover:  4 PIECES (Ø1100MM L:4000MM)
  • Location: KÜTAHYA/TURKEY

DENİZLİ CCGT THERMAL POWER PLANT

  • Definition of Work:  HEAT EXCHANGERS
  • Scope of Work:  HEAT EXCHANGERS
  • Client:  AGE CONST. & TRADING CO.
  • Year: 2017
  • Turnover:  1 PIECE (Ø1500MM L:10000MM)
  • Location: DENİZLİ/TURKEY

TUNÇBİLEK THERMAL POWER PLANT

  • Definition of Work:  HEAT EXCHANGERS
  • Scope of Work:  HEAT EXCHANGERS
  • Client:  ÇELİKLER HOLDİNG
  • Year: 2018
  • Turnover:  1 PIECE (Ø600MM L:3000MM)
  • Location: KÜTAHYA/TURKEY

KIRKA BORAN PLANT

  • Definition of Work:  HEAT EXCHANGERS
  • Scope of Work:  HEAT EXCHANGERS
  • Client:  MINISTRY OF ENERGY and NATURAL RESOURCES
  • Year: 2015
  • Turnover:  PIECES (Ø650MM-L:2700MM)
  • Location: ESKİŞEHİR/TURKEY

TANAP LOT-4

  • Definition of Work:  VALVE STATIONS SUPPORTS -PIG TRAP STATIONS- BLOCK VALVE STATIONS-STEEL ROOF MANUFACTURING AND INSTALLATION
  • Scope of Work:  HYDROMECANIC-STEEL CONSTRUCTION
  • Client:  AGE CONST. & TRADING CO.
  • Year: 2018
  • Turnover:  150 TONS
  • Location: BALIKESİR,ESKİŞEHİR,ÇANAKKALE

MELEN DAM

  • Definition of Work: MANIFOLD MANUFACTURING AND INSTALLATION
  • Scope of Work:  HYDROMECANIC
  • Client: ECE TUR ECE TURİZM İNŞ.TİC.VE MAĞ.İŞLT.A.Ş.
  • Year: 2018
  • Turnover:  100 TONS
  • Location: DÜZCE

İSRAİL BÜYÜKELÇİLİK BİNASI

  • Definition of Work: SHELTERED STEEL WALL MANUFACTURING
  • Scope of Work: STEEL CONSTRUCTION
  • Client: AKİS MİMARLIK
  • Year: 2018
  • Turnover: 100 TONS
  • Location: ANKARA

KARAKURT DAM

  • Definition of Work: DERIVATION GATES MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: AGE İNŞAAT VE TİCARET A.Ş.
  • Year: 2017
  • Turnover: 150 TONS
  • Location: KARS

KARAKURT DAM KAYAOCAĞI

  • Definition of Work: BRIDGE MANUFACTURING AND INSTALLATION
  • Scope of Work: STEEL CONSTRUCTION
  • Client: AGE İNŞAAT VE TİCARET A.Ş.
  • Year: 2017
  • Turnover: 120 TONS
  • Location: KARS

AUTOMATIC SHOT BLASTING MACHINE (2000x1100x1200mm)

  • Definition of Work: AUTOMATIC SHOT BLASTING MACHINE (2000x1100x1200mm)
  • Scope of Work: MACHINE
  • Client: SAFA KABİN MAK. İNŞ. SAN. Ve TİC. A.Ş.
  • Year: 2017
  • Turnover: 100 TONS
  • Location: ANKARA

MELEN DAM

  • Definition of Work: EXPANSION JOINTS – RADIAL GATES – WATER INTAKE GATES – PENSTOCK MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: ECE TUR ECE TURİZM İNŞ.TİC.VE MAĞ.İŞLT.A.Ş.
  • Year: 2017
  • Turnover: 2020
  • Location: DÜZCE

YENİ HAYAT HEPP PROJECT

  • Definition of Work: PENSTOCK – TRANSITIONS & ELBOWS MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: SEMİX BETON SANTRALLERİ
  • Year: 2017
  • Turnover: 150 TONS
  • Location: ERZURUM

TANAP LOT-2

  • Definition of Work: BLOCK VALVE STATIONS-STEEL ROOF MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
  • Client: SİCİM-YÜKSEL-AKKORD ORTAKLIĞI
  • Year: 2017
  • Turnover: 1400 TONS
  • Location: ERZURUM-SİVAS

TANAP LOT-1

  • Definition of Work: PIPE SPOOL – BLOCK VALVE STATIONS-STEEL ROOF MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
  • Client: FERNAS İNŞAAT A.Ş.
  • Year: 2017
  • Turnover: 6500 TONS
  • Location: ERZURUM-KARS

PENSTOCK MANUFACTURING

  • Definition of Work: PENSTOCK AND Ø 1400 SLIDE VALVE MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: PARK CİNER HOLDİNG
  • Year: 2017
  • Turnover: 1200 TONS
  • Location: SİİRT

TANAP LOT-4

  • Definition of Work: SLEDGES
  • Scope of Work: STEEL CONSTRUCTION
  • Client: PUNJ LLOYD LİMAK KALYON JV
  • Year: 2016
  • Turnover: 1150 TONS
  • Location: BALIKESİR

TANAP LOT-2

  • Definition of Work:  VALVE STATIONS SUPPORTS -PIG TRAP STATIONS- BLOCK VALVE STATIONS-STEEL ROOF MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
  • Client: SİCİM-YÜKSEL-AKKORD ORTAKLIĞI
  • Year: 2016
  • Turnover: 590 TONS
  • Location: ERZURUM-SİVAS

TANAP LOT-1

  • Definition of Work: VALVE STATIONS SUPPORTS -PIG TRAP STATIONS-LINEMARKERS AND AERIAL MARKERS MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: FERNAS İNŞAAT A.Ş.
  • Year: 2016
  • Turnover: 530 TONS
  • Location: ERZURUM-KARS

BALLIKAYA DAM

  • Definition of Work: : PENSTOCK MANUFACTURING- Ø 2000 CONE VALVE – WATER INTAKE GATES -1800*1800 SLIDE VALVE MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: YÖNTAŞ İNŞAAT SANAYİ VE TİCARET A.Ş.
  • Year: 2016
  • Turnover: 500 TONS
  • Location: SAKARYA

AGE KAZAN WAREHOUSE BUILDING

  • Definition of Work: WAREHOUSE BUILDING MANUFACTURING AND INSTALLATION
  • Scope of Work: STEEL CONSTRUCTION
  • Client: AGE İNŞAAT VE TİCARET A.Ş.
  • Year: 2015
  • Turnover: 185 TONS
  • Location: ANKARA

MELEN DAM DRINKING WATER LINE

  • Definition of Work: PENSTOCK -GATES-, TRANSITION, WATER INTAKE STRUCTURE MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: ECE TUR-YÖNTAŞ ADİ ORTAKLIĞI-DSİ 14.BÖLGE
  • Year: 2015
  • Turnover: 5000 TONS
  • Location: DÜZCE

AMBAR DAM DERIVATION CONDUIT PENSTOCK PIPELINE

  • Definition of Work: TRANSITION-EXPANSION JOINT-SLIDING SUPPORT –MANIFOLD MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: YÖNTAŞ TÜRKERLER ADİ ORTAKLIĞI-DSİ 10.BÖLGE
  • Year: 2015
  • Turnover: 1000 TONS
  • Location: DİYARBAKIR

AMBAR DAM DERIVATION CONDUIT

  • Definition of Work: Ø1800 AND Ø2000 BUTTERFLY VALVE – Ø1200 CONE VALVE -1200*1200 SLIDE VALVE
  • Scope of Work: HYDROMECANIC
  • Client: YÖNTAŞ TÜRKERLER ADİ ORTAKLIĞI-DSİ 10.BÖLGE
  • Year: 2015
  • Turnover: 6 ADET
  • Location: DİYARBAKIR

GARZAN HPP PROJECT

  • Definition of Work: HPP 900*900 HYDROLIC SLIDE VALVE MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: FERNAS İNŞAAT A.Ş.
  • Year: 2015
  • Turnover: 1 ADET
  • Location: BATMAN

ILISU DAM AND  HPP

  • Definition of Work:  ENERGY WATER INTAKE STRUCTURES- ENTRY VENTILATION TUNNEL- MECHANICAL WORKS OF POWERHOUSE
  • Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
  • Client: NUROL-CENGİZ İNŞAAT-DSİ 16.BÖLGE
  • Year: 2015
  • Turnover: 1000 TONS
  • Location: BATMAN

HAYMANA TÜRKŞEREFLİ POND SLUICE OUTLET PENSTOCK PIPELINE

  • Definition of Work: TRANSITION-EXPANSION JOINT-SLIDING SUPPORT –MANIFOLD MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC
  • Client: SÜRÜCÜ İNŞAAT MADENCİLİK-DSİ 5.BÖLGE
  • Year: 2015
  • Turnover: 500 TONS
  • Location: ANKARA

HAYMANA TÜRKŞEREFLİ POND SLUICE OUTLET PENSTOCK PIPELINE

  • Definition of Work: Ø900 BUTTERFLY VALVE 700*700 SLIDING VALVE MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: SÜRÜCÜ İNŞAAT MADENCİLİK-DSİ 5.BÖLGE
  • Year: 2015
  • Turnover: 3 QTY
  • Location: ANKARA

AIRCRAFT MAINTENANCE HANGAR

  • Definition of Work: AIRCRAFT MAINTENANCE HANGAR STEEL WORKS
  • Scope of Work: STEEL CONSTRUCTION
  • Client: TEMSAN YAPI VE MAKİNA ENDÜSTRİ A.Ş.
  • Year: 2014
  • Turnover: 100 TONS
  • Location: İSTANBUL

MANYAS DIVERSION TUNNEL PENSTOCK PIPELINE REVISION

  • Definition of Work: Ø800 BUTTERFLY VALVE MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: BE-HA-ŞE İNŞ.TİC. VE SAN.LTD.ŞTİ.-DSİ 25.BÖLGE
  • Year: 2014
  • Turnover: 1 QTY
  • Location: BALIKESİR

GARZAN HPP PROJECT

  • Definition of Work: HYDROLIC PISTON GATE – GATE HOUSE- HOIST LIFTING COLUMN MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: FERNAS İNŞAAT A.Ş.
  • Year: 2014
  • Turnover: 1100 TONS
  • Location: BATMAN

ŞIRNAK GÜVENLİK DAM

  • Definition of Work: Ø2000 BUTTERFLY DAM MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: DSİ 10.BÖLGE
  • Year: 2014
  • Turnover: 1 QTY
  • Location: ŞIRNAK