WATER TREATMENT PROJECT-QB

Definition of Work: CATWALK  MANUFACTURING

  • Scope of Work: STEEL CATWALKS  PRODUCTS
  • Client: İDE COMPNAY-CHILE
  • Production  Capacity:
  • Year: 2022
  • Capacity : 100 TONS
  • Location: CHILE

WATER TREATMENT PROJECT-SOREK

Definition of Work: CATWALK  MANUFACTURING

  • Scope of Work: STEEL CATWALKS  PRODUCTS
  • Client: İDE COMPNAY-ISRAEL
  • Production  Capacity:
  • Year: 2022
  • Capacity : 100TONS
  • Location: ISRAEL

LAOS DAM

  • Definition of Work: HYDROMECANIC EQUIPMENTS MANUFACTURING
  • Scope of Work: EMBEDDED 2.PHASE PRODUCTS
  • Client: ATB RIVA CALZONICOMPANY-ITALY
  • Production  Capacity: 650 MW
  • Year: 2020
  • Capacity : 105 TONS
  • Location: LAOS

ACHWA DAM

  • Definition of Work: HYDROMECANIC EQUIPMENTS MANUFACTURING
  • Scope of Work: HYDROMECANICS PRODUCTS
  • Client: ATB RIVA CALZONICOMPANY-ITALY
  • Production  Capacity: 42 MW
  • Year: 2019-2020
  • Capacity : 150 TONS
  • Location: UGANDA

KIKIGATI DAM

  • Definition of Work: HYDROMECANIC EQUIPMENTS VE  MANUFACTURING
  • Scope of Work: HYDROMECANIC PRODUCTS
  • Client: ATB RIVA CALZONICOMPANY- ITALY
  • Production  Capacity: 16 MW
  • Year: 2019-2020
  • Capacity : 500 TONS
  • Location: UGANDA

NAM THEUN DAM

  • Definition of Work: PENTSTOCKS  MANUFACTURING
  • Scope of Work: PENSTOCKS PRODUCTS
  • Client: ATB RIVA CALZONICOMPANY- ITALY
  • Production Capacity:650 MW
  • Year: 2019-2020
  • Capacity : 150 TONS
  • Location: LAOS

LEITNER GROUP 

  • Definition of Work: YOKES  EQUIPMENTS MANUFACTURING
  • Scope of Work: YOKES PRODUCTS
  • Client: LEITNER GROUP COMPANY-ITALY
  • Consultant:POMA
  • Year: 2020
  • Capacity : 100 TONS
  • Location: ITALY

FAIZABAD DAM

  • Definition of Work: HYDROMECANIC EQUIPMENTS VE STEEL CONSTRUCTION MANUFACTURING AND INSTALLATION
  • Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
  • Client: FEKA İNŞAAT SANAYİ VE TİCARET A.Ş.
  • Main Client: AFGANISTAN MINISTRY OF  ENERGY WATER
  • Consultant:FITCHNER
  • Year: 2018-2020 
  • Capacity : 840 TONS
  • Location: FAIZABAD / AFGANISTAN

LEITNER ROPEWAYS

  • Definition of Work: ROPEWAYS CONES  MANUFACTURING
  • Scope of Work: CONES
  • Client: LEITNER GROUP
  • Consultant:POMA
  • Year: 2019-2020
  • Capacity : 100 TONS
  • Location: SLOVAKIA AND ITALY

HPP MESTIACHALA 1

  • Definition of Work: PENSTOCK-ELBOW-MANIFOLD MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: SYNERGY CONSTRUCTION
  • Consultant:ILF
  • Year: 2017-2018
  • Capacity : 100TONS
  • Location: GEORGIA

HPP MESTIACHALA 2

  • Definition of Work: PENSTOCK-ELBOW-MANIFOLD MANUFACTURING
  • Scope of Work: HYDROMECANIC
  • Client: SYNERGY CONSTRUCTION
  • Consultant:ILF
  • Year: 20172018
  • Capacity: 110 TONS
  • Location: GEORGIA

KAZAKHISTAN ASTANA SHERATON HOTEL

  • Definition of Work: SPIRAL STAIRCASE MANUFACTURING AND INSTALLATION
  • Scope of Work: STEEL CONSTRUCTION
  • Client:NERGİZ DEKORASYON
  • Year:2017-2018
  • Capacity :250 TONS
  • Consultant:MOTT MAC DONALD
  • Location:KAZAKHISTAN

GHORJOMİ BRIDGE

  • Definition of Work: STEEL BRIDGE
  • Scope of Work: STEEL CONSTRUCTION
  • Client: AGE İNŞAAT VE TİCARET A.Ş.
  • Year: 2016-2017
  • Capacity: 1000 TONS
  • Consultant:MOTT MACDONALD
  • Location: GEORGIA

SHUAKHEVI HPP

  • Definition of Work: POWERHOUSE ROOF STEELWORK – HIGH PRESSURE PENSTOCK PIPELINE –DAM GATES MANUFACTURING
  • Scope of Work: HYDROMECANIC-STEEL CONSTRUCTION
  • Client: AGE İNŞAAT VE TİCARET A.Ş.
  • Main Client: TATA -CLEAN ENERGY
  • Consultant:MOTT MACDONALD
  • Production  Capacity:230 MW
  • Year: 2015-2017
  • Capacity: 3200 TONS
  • Location: GEORGIA

DEVOIL HYDROPOWER 

  • Definition of Work: DISCHARGE EQUIPMENTS 
  • Scope of Work:DISCHARGE EQUIPMENTS
  • Client: LİMAK A.Ş
  • Consultant:ROBBINS
  • Year: 2018-2019
  • Capacity: 180 TONS
  • Location: ALBANIA